Shift report · 27 November 2026
The whole floor, written down.
Inspections
8
Pass rate
75%
Average score
86.5
Re-cleans ordered
2
Rooms by status
-
Needs clean 8
-
Being cleaned 3
-
Awaiting inspection 5
-
Ready for guests 6
-
Out of service 2
24 rooms in the inventory across floors 2–4.
Inspection log
| Room | Cleaned by | Inspector | Score | Result | Notes | When |
|---|---|---|---|---|---|---|
| 202 | Priya Raman | A. Castellan | 68 | Re-clean | Bed skirt torn, hair in basin — returned. | 27 Nov 13:40 |
| 405 | Priya Raman | N. Ferreira | 84 | Pass | Carpet edge needs deeper vacuum next pass. | 27 Nov 14:40 |
| 406 | Marcus Odell | A. Castellan | 72 | Re-clean | Shower grout mould, re-clean ordered. | 27 Nov 15:40 |
| 401 | Samir Qureshi | N. Ferreira | 99 | Pass | Terrace swept, benchmark room for training. | 27 Nov 16:40 |
| 306 | Lena Kowalski | N. Ferreira | 94 | Pass | Turndown set, amenities aligned. | 27 Nov 17:40 |
| 301 | Ana Belmonte | A. Castellan | 88 | Pass | Mini-bar restocked, remote sanitised. | 27 Nov 17:40 |
| 206 | Marcus Odell | A. Castellan | 91 | Pass | Minor dust on headboard ledge, corrected. | 27 Nov 18:40 |
| 201 | Priya Raman | A. Castellan | 96 | Pass | Linen crisp, bathroom glass spotless. | 27 Nov 18:45 |
Maintenance register
Raised by attendants on the board; closing one here puts it back in the daily report.
| Room | Issue | Priority | Raised | Status | |
|---|---|---|---|---|---|
| 407 | Balcony door lock jammed, engineering parts on order | High | 26 Nov 19:40 | Open | |
| 207 | Bathroom extractor fan seized — room held out of service | High | 25 Nov 19:40 | Open | |
| 305 | Thermostat reads 4° high | Medium | 27 Nov 13:40 | Open | |
| 302 | Bedside lamp flickering | Low | 27 Nov 16:40 | Open | |
| 204 | Mini-bar fridge noisy at night | Medium | 24 Nov 19:40 | Resolved 25 Nov 01:40 | |
| 308 | Chipped bathroom tile replaced | Low | 23 Nov 19:40 | Resolved 24 Nov 01:40 |
No room leaves this floor unchecked.
Back to the room board